ALIMAK MINING PDF

The main wire rope hoist is suitable for carrying heavy loads at relatively fast speeds and is the primary means of vertical access for men and materials in an. Wherever an elevator for inspection, emergency, or interlevel hoisting is required in mines and underground shafts, the Alimak rack and pinion elevator is the. Raise climbing, widely known as the Alimak mining method after the company that introduced it, is a variation on longhole stoping developed.

Author: Mazubei Kajizshura
Country: Andorra
Language: English (Spanish)
Genre: Education
Published (Last): 21 November 2018
Pages: 238
PDF File Size: 18.89 Mb
ePub File Size: 7.19 Mb
ISBN: 185-1-15744-315-7
Downloads: 99941
Price: Free* [*Free Regsitration Required]
Uploader: Tushicage

These drifts are driven from the shaft or established mining areas to the new ore zone. A true innovation in underground mining, the Alimak method provides the highest safety standards in the industry, while increasing zlimak, adding greater flexibility and maneuverability, and reducing overall mining costs.

The holes are most often mechanically loaded with either ANFO or an emulsion explosive. Less Dilution The production drill sits in the middle of its work, cutting the drilled length in half.

This step will be included if the stope is in an area that requires fill and the fill method requires a fence. Drawpoints and Climber Nest: Most of the rest of the development is in ore see centerfold.

There are several explanations, which include: Better Ground Control Cables can be installed right up nining middle of the hangingwall, where they will do minnig most good.

This step is often required where rock fill is used.

The set-up also provides ventilation if miners leave open one of the raises after breaking through to the next level. Recognized as a leader in Alimak LH narrow vein stope mining, Manroc has developed proven and effective techniques yielding high tonnage and low dilution results.

Raise (mining) – Wikipedia

Alimak rack and pinion elevators are ideally suited for providing the secondary, emergency vertical access required by mine safety regulations. Mining narrow ore bodies is vital to the international mining industry, and involves a high level of expertise surrounding geological issues.

  ECOLOGIA PROFUNDA FRITJOF CAPRA PDF

The production drill sits in the middle of its work, cutting the drilled length in half. We are your preferred underground mining professionals. Other improvements have focused on the climber end. Where required, the stope hangingwall can be supported with deformed strand resin-grouted cable bolts in a regular pattern along the raise.

The bulk of the waste development required with this method is the ore zone access and the raise climber nests. Switching to a new drill, they drive cable bolts up the centre of the raise, grout them in place and drill production holes.

Raise (mining)

So you put in a lot of work, but you get a lot of ore out at the end. The graph is divided into areas that have alimsk delineated by observed stope behaviour.

The Seabee mine had to adapt to this new cycle. This advantage is easily visualized if one imagines the hangingwall as a fractured beam or plate. The company has committed to expanding the method beyond its current, relatively small lens.

Alimak elevators are also used to provide a simple and economical means of connecting different levels further out in the tunnel system and for transporting men and material between the levels and the stopes.

There are several explanations, which include:. Teck installs first production-scale machine learning system Machine learning predicts when trucks will need maintenance at Fording River coal mine. All packed and ready to go Eavan Moore. Cable bolting provides better ground support from its position in the central hangingwall of the stope, and the broken ore adds support by putting outward pressure on raise walls.

Since drills can only reach so far, the traditional approach demands sublevels about every 25 metres. Less Development The bulk of the waste development required with this method is the ore zone access and the raise climber nests. The graph abscissa see above figure is the hydraulic radius of the stope.

  KARTOGRAPHY BY KAMILA SHAMSIE PDF

That was the main attraction for Claude Resources, which introduced the Alimak method in its L62 zone at Seabee in late They blast the first few metres of the raise and then install a climber running on a curved rail from the nest into the raise. This final step should be done in such a way that concerns about adjacent stope stability and hydraulic heads are addressed satisfactorily.

Fewer, larger stopes can be taken quicker because there are fewer cycles, i. This step is done once the stope is completely blasted.

A Leader in Alimak Mining

After each round of blasting, the broken ore falls down the raise and is collected by a scooptram. The down dip helps the toes break to the stope wall. The drifts are commonly sized to accommodate the large scooptrams used for production mucking and are often driven with jumbos.

Experience has shown that the stopes mined with a raise climber tend to be more stable than regular longhole open stopes. Faster Overall Extraction With better ground control, larger stopes can be taken. Raises must be driven big enough that a 2.

For more information on our Alimak production mining services, please contact us. With less development, faster ore access, better ground control, and faster overall mining, it is easy to see how raise mining will cost less than regular open stoping.

Strike length was also reduced from 15 to 14 metres after problems with hangingwall caving and dilution. This is less important alumak sulphides, where the driller can tell if the bit is in laimak by the colour of the cuttings. The hydraulic radius is defined as the cross-sectional area of the opening divided by its perimeter.